BID OPENING – CHESTERTOWN MARINA
DECEMBER 16, 2016
Mayor Cerino called the bid meeting for the Marina to order at 12:00 p.m. on Friday, December 16, 2016. In attendance were W.S. Ingersoll (Town Manager), Kees de Mooy (Zoning Administrator), Jennifer Mulligan (Town Clerk) and guests.
Four bids were received as follows:
Hi-Tide Marine Construction, LLC Contract Price: $584,276.45
9748 Stephen Decatur Hwy. #200 Bulkheading per sq.ft.: $660.00
Ocean City, MD 21842 Class B 12” pilings per foot: $17.50
Dean Strawbridge: dean@hitidemarine.com Sheeting per foot (over 20’): $19.50
410-632-1426(443) 277-2814
Missy Strawbridge: missy@hitidemarine.com
Bid Conditions: The price above is for activities described in the general notes. However, Hi-Tide believes the way described in the general notes construction will not be structurally sound. Hi-Tide has included a second proposal which we highly recommend the Town of Chestertown going with so that the construction is structurally sound. Total package price with bid conditions: $680,446.21
Marine Technologies, Inc. Contract Price: $1,743,000.00
6604 Fort Smallwood Road Bulkheading per sq.ft.: $4,900.00
Baltimore, MD 21226 Class B 12” pilings per foot: $55.00
Terry Clarke: info@marinetechnologiesinc.com Sheeting per foot (over 20’): $695.00
410-355-2000
Bid Conditions: None
Kingfisher Environmental Services, Inc. Contract Price: $374,139.00
3002 Singerly Road Bulkheading per sq.ft.: $587.50
Elkton, MD 21921 Class B 12” pilings per foot: $47.50
Ted Mercer: tedmercer@verizon.net Sheeting per foot (over 20’): $42.20
410-275-2215
Bid Conditions: None
Dissen & Juhn Corporation Contract Price: $731,100.00
101 Log Canoe Circle, Suite J Bulkheading per sq.ft.: $979.00
Stevensville, MD 21666 Class B 12” pilings per foot: $22.00
Gil Dissen: dwdissen@dissen-juhn.com Sheeting per foot (over 20’): $10.00 vertical ft.
410-604-1802
Bid Conditions: Includes stamped engineered drawings per plans. If final plans show changes are required will add. Includes helical tiebacks. Backfill using #57 stone add $7.00/ton. SG650 vinyl sheeting add $3.30 sq.ft. CLOC9000 Does not appear to be adequate. Alternate using a precast boat ramp (Deduct $10,000). It is our opinion as a marine contractor with 43 years of experience that the water work on this job cannot be completed by February 15, 2017. We propose working after the time of year restrictions. We are open to negotiation with respect to delivery.
Mayor Cerino stated that the bids will be checked for completeness and that all bidders will receive an electronic version of the bids for their review.
Mayor Cerino closed the meeting at 12:11 p.m.